Sunday, February 23, 2020

Read article and answer these, ( businuss communications) Case Study

Read article and answer these, ( businuss communications) - Case Study Example He also shows him a copy of a memo, does not listen to Dan’s explanations, and dismisses him. Ed is using these tactics to show Dan that John Green was not running the marketing department in the correct way. Ed achieves his intention. Ed Harley communicates as much information on the marketing department as required in the context. Dan is not eager to meet him. This is because of his perceived role of sacking employees in the corporation. His purpose of communication to Dan is to convey the flaws of the marketing department so that Dan can comprehend the anticipated meaning of his words and actions. Moreover, Ed’s action and words convey just enough to highlight his intention. He relies on Dan to translate the details of what he does not openly convey. His utterances give Dan the chance to deduce meaning of his intention. Ed provides a clue of his intention to Dan through his words and action. Dan submits, this is evident on his

Friday, February 7, 2020

Justification write up for nominating for Environment, Health & Safety Term Paper

Justification write up for nominating for Environment, Health & Safety award - Term Paper Example Central Operations is committed to creating and sustaining an accident free culture for our employees and customers, as well as the public. Each operating system is responsible for integrating EH&S considerations, aimed at minimizing and controlling potential risks and hazards, into the planning, design, construction, operation and maintenance of the company’s energy delivery system and facilities. Metropolitan Transit Authority (MTA) was performing the design of the East Side Access (ESA) project, which is intended to bring Long Island Rail Road (LIRR) to the Grand Central Terminal. As part of this project, blasting was performed to break their wall adjacent to the existing steam delivery system. This blasting created vibrations below ground which damaged the steam support components. As a result of the blast, a 16† steam pipe shifted and fell off the supports. Engineering, in collaboration with Operations, determined the risks, scope of work, performed stress analysis, layout, and field inspections to resolve this problem. SDE and Steam Operations made field visits, identified the potential risks, and acted urgently to maintain safety, reliability, and to restore the system. In an effort to restore the system, the team inspected the affected site and recommended installing 4 special beam guides at the pipe offsets to accommodate for unusual pipe stress. Due to limited drilling depth, as a result of city sewer pathways crossing below our structures, the guides were designed to have a special base plate and anchor bolts. Field inspections found asbestos containing material insulating the original steam pipe. The abatement crew removed the asbestos insulation, using procedure 11924-5, and prior to doing any construction work to re-align the main. They then took measurements submitting them to contracted engineers selected to begin work on the repairs. Next, our